{"id":1214,"date":"2021-09-05T09:06:22","date_gmt":"2021-09-05T09:06:22","guid":{"rendered":"https:\/\/whatblueprint.com\/?p=1214"},"modified":"2023-04-14T09:45:35","modified_gmt":"2023-04-14T09:45:35","slug":"how-long-does-it-take-an-electrician-to-wire-a-new-house","status":"publish","type":"post","link":"https:\/\/whatblueprint.com\/how-long-does-it-take-an-electrician-to-wire-a-new-house\/","title":{"rendered":"How Long Does It Take An Electrician To Wire A New House?"},"content":{"rendered":"\n
In today\u2019s world, electricity is important now more than ever. With hundreds of thousands of new homes being built every year in the United States, many people wonder how newer homes are wired. New homeowners want to get ready to move into their new homes, and they want to know how things work to give them a better idea of how to prepare.<\/p>\n\n\n\n
Electricals for a home are installed throughout the construction phase and depend on how long it takes for the home to be built. Electricals are planned from the start by an electrical engineer and are part of the specifications given to a contractor before the construction project for a new home begins.<\/strong><\/p>\n\n\n\n Like all things built by professionals, everything follows the right process and procedures to ensure that clients get what\u2019s up to standard and of the right quality. Knowing how exactly your house gets wired gives homeowners a better understanding of their options if they plan on making any changes to their electricals in the future.<\/p>\n\n\n\n Electricians follow a standard procedure for electrical construction within a home, just like any other building professional. We\u2019ll be covering the different steps briefly to give homeowners a better idea of the progress made throughout this type of project.<\/p>\n\n\n\n Right off the bat, the construction of a home will require electricity. An electrician sees that the power consumption needs of different construction tools are met by having a temporary electrical source readily available at the site.<\/p>\n\n\n\n While some of the house members are setting it(Ex. Concrete drying), electrical conduits, where the wires pass through inside your walls, columns, beams, etc., are already placed in. Remember that before construction even begins, all electrical plans for a new home are already planned out.<\/p>\n\n\n\n The rough-in happens during the phase in which the home is fully built, meaning that all structurals are already standing, and at this point, the construction is primarily focused on tidying up. Electricals such as switchboards, lights, entertainment, security, etc., are installed.<\/p>\n\n\n\n This is the first initial step in which wiring and electricity are routed towards your home and to appliances used. At this stage, the electrical plan is applied by installing the different circuits throughout your home where they need to be and directing all these back to your circuit board.<\/p>\n\n\n\n Receptacles, switches, and other mechanisms are installed into the house at this point. This stage usually only takes a day to complete.<\/p>\n\n\n\n At this stage, the house is more or less complete and only needs to be furnished. This is where appliances such as fans, air conditioning, etc., are installed into the house. The reason why appliances are the last thing to be installed is to avoid damaging them during construction.<\/p>\n\n\n\n Now that all the appliances are installed, the electrician and the homeowners can start testing everything to ensure that all appliances and fixtures are working properly and receiving the electricity they need to function.<\/p>\n\n\n\n Any last-minute modifications to the electrical system are made here. Once everything is satisfactory for both client and electrician, the electrician then gives a warranty in case anything goes wrong during a certain period of time.<\/p>\n\n\n\n Hopefully, this overview of how your electricals are installed into your house gives homeowners more insight into what to expect. With all other utilities, electricals are well-planned and are worked on throughout the construction phase.<\/p>\n\n\n\n<\/a>What are the steps in wiring a home?<\/h2>\n\n\n\n
1. Temporary Electric and Underground Conduit<\/h3>\n\n\n\n
2. Rough-in<\/h3>\n\n\n\n
3. Detailing<\/h3>\n\n\n\n
4. Finishing<\/h3>\n\n\n\n
5. Testing, Modifications, and Warranty<\/h3>\n\n\n\n